トピック
  • HOME »
  • トピック »
  • Practice Standard for Work Breakdown Structures – FB2 download

お知らせ フォーラム 勉強レストランそうなんだ掲示板 Practice Standard for Work Breakdown Structures – FB2 download

  • このトピックには0件の返信、1人の参加者があり、最後にCaitlin Vaughnにより3年、 6ヶ月前に更新されました。
1件の投稿を表示中 - 1 - 1件目 (全1件中)
  • 投稿者
    投稿
  • #5696 返信
    Caitlin Vaughn
    ゲスト

    Practice Standard for Work Breakdown Structures
    by Project Management Institute

    🔰 Practice Standard for Work Breakdown Structures – CLICK HERE 🔰

    • Publisher: Project Management Institute
    • Format: paperback, 111 pages
    • Language: english
    • Genres: business
    • Author: Project Management Institute
    • Release date: August 1, 2013
    • ISBN: 9781933890135 (1933890134)

    About The Book

    The Practice Standard for Work Breakdown Structures-Second Edition supplies project managers and team members with direction for the preliminary development and the implementation of the WBS. Consistent with A Guide to the Project Management Body of Knowledge (PMBOK® Guide)-Third Edition, the WBS Practice Standard presents a standard application of the WBS as a project management tool. Throughout the book, the reader will learn what characteristics constitute a high-quality WBS and discover the substantial benefits of using the WBS in every-day, real-life situations.

    Online book Practice Standard for Work Breakdown Structures by Project Management Institute read on Barnes & Noble. FictionBook ebook Practice Standard for Work Breakdown Structures buy cheap for iPhone. Hardback Practice Standard for Work Breakdown Structures Project Management Institute on Android on Bookshop.

1件の投稿を表示中 - 1 - 1件目 (全1件中)
返信先: Practice Standard for Work Breakdown Structures – FB2 download
あなたの情報:





<a href="" title="" rel="" target=""> <blockquote cite=""> <code> <pre class=""> <em> <strong> <del datetime="" cite=""> <ins datetime="" cite=""> <ul> <ol start=""> <li> <img src="" border="" alt="" height="" width="">

お気軽にお問合せください TEL 03-5394-6148 受付時間10:00-19:00[土・日・祝日除く]

PAGETOP
Powered by WordPress & BizVektor Theme by Vektor,Inc. technology.